Source: Date:2012-08-31
Recently, MBEC won the bid of People’s Bridge maintenance project (replace all the cables) in Shangyu City, Zhejiang province. The accepted contract amount is 12.57 million RMB and the construction period 150 days.
The main bridge of this bridge is single-tower double-cable-plane cable-stayed bridge, the span arrangement is 125+125m. The width of this bridge is 26m, including the width of the vehicle lane is 18m and the sidewalk is 2×3m.
up:
next: