Source: Date:2013-03-26
Recently, MBEC won the Bid of Chaoyang Yandu New City East Street Bridge Project in Chaoyang city, Liaoling province. With a total length of 277.44m, the bridge has a span arrangement of 29.98m+30.02m+2×90m+30.04m=270.04m, the width of the bridge deck is 34m. The main bridge is 2×90m two- span steel arch tower prestressing concrete girder cable-stayed bridge with double cable planes, arch tower of which is V-shaped. The approach bridge is of precast prestressing concrete T girder structures, with a total length of 90m and bridge deck width of 30m.
up:
next: