Source: Date:2013-07-02
Recently, China Major Bridge Engineering Co.,LTD won the bidding of tunnel works of ShenZhen LNG Project, for which the Accepted Contract Amount is RMB 110 million, and will be executed by the fourth subsidiary.
ShenZhen LNG tunnel is the typical mountain tunnel, which is 584 meters long, and the side slope is 60 meters long. The Maximum buried depth of the tunnel is approximately 40 meters.
up:
next: