Source: Date:2014-02-11
MBEC recently won the Bid of Jiamin Elevated Road (G2 Road-S6 Road) and Section JMB2-1 of Newly Built Ground Road Project, the Accepted Contract Amount is 236.44 million RMB and the construction period is 580 days.
This project is located in Shanghai, designed to highway class 1. The total length of the road is 1.3km and the length of the ground road is 1.1km .
up:
next: